Independent guides. No sponsored rankings.How we make money →

Methodology

Last updated November 9, 2026

Every number on this site is either sourced or labelled as an estimate. This page explains the difference, and how a claim gets from a source document to a published page.

1. Primary sources first

Finish claims come from the manufacturer's application guide and technical data sheet: mil thickness, cure window, startup chemistry and the conditions that void the warranty. Preparation guidance follows the same documents and the industry technical guidance named on the page. Cost bands come from published US price guides, with the month checked stated on the page.

2. Cost models show their inputs

Installed cost is modelled from visible inputs: the material or equipment price, the labour and access scope (excavation, drain, electrical, permit), consumables, and a reserve for service or repair. We do not present a single "average cost" as if it were a quote; the range and what it includes are stated on the page.

3. How options are compared

We compare finishes on installed cost per square foot, expected service life under normal chemistry, feel and slip resistance, repairability and the startup discipline each one demands. A finish earns a recommendation for a stated pool and use; no supplier can buy a place in a comparison.

4. What we have not tested

We do not run a laboratory or a crew, and we do not carry out every job we write about. When a claim comes from a manufacturer document, an adopted code, a certification listing or a contractor report, we say which. We do not imply first-hand testing we did not perform.

5. Sources we work from

Source typeWhat it decidesHow it is cited
Finish manufacturer application guidesMil thickness, cure window, startup chemistry, warranty conditionsDocument and product named
Industry technical guidance (plasterers and pool trade bodies)Preparation, bond coat and common failure causesGuidance named
State contractor licensing boardsWhich licence a resurfacing contractor must holdBoard named, with its lookup link
Local permit officesWhether draining, replumbing or electrical work needs a permitOffice named, with its link
Published US price guidesInstalled cost bands per square footBand with the month it was checked

When two sources disagree, the page says which one it followed and why. A figure that cannot be traced to a document is labelled an estimate, and an estimate is never presented as the price of a specific job.

6. Listings and directory data

The service-area directory is compiled from public business records: the firm's own website, its published address and phone number, and the state or local licence register named on the city page. A record is marked verified only when the name, address, phone and licence have been checked against those sources and the date of the check recorded; everything else is labelled. Where a source does not publish a ZIP code or a website, the field is left blank rather than guessed.

7. Corrections

If a code, a specification or a listing changes, we update the article and its "last updated" date. Emailcontact@poolresurfacingguide.com with the page and the correction.